Quote-Ready Now Self-Performed Licensed & Insured
Commercial & Heavy-Civil Construction

Stormwater Management and Drainage

Ponds, storage, controls, infiltration, sewers, channels, and overland routes built to approved quantity and quality targets across the GTA and Ontario. Harrowgate Group self-performs the work to your engineered drawings, load, and finish, and completes it on site across the GTA and Ontario.

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721
Licensed, Insured & WSIB Certified · 20 Years in Business
Licensed, Insured & WSIB-Registered Completed to code & Ontario requirements Built to drawings, self-performed & completed Shipped across Canada & North America
Why Harrowgate Group

Stormwater Management and Drainage, done right

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.

Made to last

Heavy-duty steel and finishes chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

Our Process

Stormwater management construction controls rain and snowmelt through collection, conveyance, storage, treatment, infiltration, erosion protection, and regulated release. Harrowgate self-performs storm sewers, ponds, tanks, chambers, swales, channels, infiltration systems, control structures, outlets, grading, and restoration across the GTA and Ontario.

  1. 01 Send your inquiry, drawings, photos, or a description of what you need.
  2. 02 We come measure and assess the site (or work from your specs and drawings).
  3. 03 We build your stormwater management and drainage to the engineered drawings on site, finished for the conditions.
  4. 04 We return to deliver and install it, set, levelled, and done right on site.
Stormwater Management and Drainage being built and completed on site by Harrowgate Group
Completed Stormwater Management and Drainage installation by Harrowgate Group
Finished On Site

Delivered, installed, and built to last

Self-performed on site to the engineered drawings, coordinated with concrete, servicing, and the surrounding work, then a clean, documented finish.

  • Coordinated with the surrounding build
  • Durable finishes for real-world wear
  • Quote-ready support from spec to delivery
FAQ

Stormwater Management and Drainage FAQ

What does a stormwater management system control?

A complete system addresses runoff volume, peak flow, water quality, erosion, water balance, safe surface conveyance, and downstream capacity according to the approved design. Harrowgate builds the physical collection, storage, treatment, infiltration, control, and outlet components, then verifies the elevations and dimensions on which the hydraulic model depends.

What is enhanced water-quality protection in Ontario?

Ontario's stormwater framework defines performance levels based on long-term suspended-solids removal and facility design. Current Ontario Regulation 137/25 requires at least enhanced protection for qualifying new works. The engineer identifies the approved treatment train and criteria; Harrowgate protects media, forebays, controls, and storage geometry needed to achieve that design.

Why must infiltration systems be protected during construction?

Fine sediment from exposed earth can clog native soil, stone voids, geotextile, or engineered media before the facility begins operating. Harrowgate diverts dirty construction runoff, limits trafficking and compaction, keeps stone clean, and delays final connection until tributary surfaces are stabilized. Contaminated material is removed rather than hidden under a clean top layer.

How is pond storage volume verified?

Surveyed bottom, side slope, bench, berm, structure, and overflow elevations are compared with the approved stage-storage geometry. Harrowgate tracks fill and sediment so the constructed basin does not lose volume. Critical measurements occur before topsoil, liner protection, riprap, or water makes the earth surface difficult to inspect and correct.

What causes a stormwater outlet to erode?

High velocity, concentrated flow, poor alignment, undersized protection, missing filter, unstable receiving soil, or a tailwater condition different from design can mobilize the outlet. Harrowgate prepares the subgrade, installs specified geotextile, stone, apron, headwall, or energy dissipator, keys edges, and connects the discharge smoothly to the receiving channel.

How are flow-control orifices checked?

The opening diameter, shape, invert, plate orientation, seal, fasteners, and upstream debris protection are physically measured against the detail. Harrowgate records the installed control before the chamber is closed. A small dimensional or elevation error can materially alter release rate and storage depth, so the supplier label alone is not accepted as verification.

What documents are needed for stormwater construction pricing?

Provide the approved stormwater report and model criteria, grading and sewer plans, structure details, Environmental Compliance Approval or registration conditions, erosion-control plan, geotechnical and hydrogeological data, liner and media specifications, outlet permits, planting requirements, survey criteria, commissioning tests, maintenance access, and phased temporary-drainage plan.

Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction, self-performed for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for stormwater management and drainage

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB certified.

(416) 629-0721

Licensed, Insured & WSIB Certified · Self-performed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call