Quote-Ready Now Engineer & City Coordinated Licensed & Insured
Storage Tank Removal, completed by Harrowgate Group
Commercial & Heavy-Civil Construction

Storage Tank Removal

Harrowgate Group completes storage tank removal directly for industrial owners, facility managers, developers, and municipalities across Toronto, the GTA, and Ontario, with the equipment, field controls, documentation, and civil restoration kept under one accountable construction team.

(416) 629-0721
  • Licensed, Insured & WSIB-Covered
  • 20 Years in Business

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721
20 Years in Business
Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Completed on site and built to the drawings Performed & installed on site across Ontario
Why Harrowgate Group

What to expect from storage tank removal

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.

Made to last

Durable materials and methods chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How we plan and deliver storage tank removal

Storage tank removal safely empties, isolates, cleans, disconnects, lifts, transports, and documents an aboveground or underground tank and its associated equipment. Harrowgate completes the field work across Toronto and the GTA, coordinating TSSA requirements, environmental sampling, contaminated material controls, lifting, excavation, and permanent restoration around operating commercial and industrial sites.

  1. 01 Send your inquiry, a few photos or a description of the site.
  2. 02 We come out, assess the site, take measurements, and confirm the scope.
  3. 03 We complete the storage tank removal on site, to the load and finish the job needs.
  4. 04 We install it, finish to grade, and clean up, one accountable crew, start to finish.
Storage Tank Removal being built and completed on site by Harrowgate Group
Local Context

A closer look at storage tank removal

Scope

Understanding storage tank removal

How we complete storage tank removal by Harrowgate Group

How we complete storage tank removal

Our storage tank removal sequence starts with verified site information, controlled work zones, and written acceptance points, then moves through field execution, consultant inspection, records, and restoration. We assign each material, asset, sample area, and load a defined status so crews know what can move, what must remain exposed, and who releases the next step.

We obtain the required records and notifications, confirm the competent fuel contractor and environmental roles, then shut down and lock out the system. Product is transferred to an approved container or receiver. The tank is cleaned and its atmosphere controlled using the specified procedure before hot work or confined access is considered.

Lines are disconnected and capped. Underground tanks are exposed without striking the shell, freed from hold downs, and lifted from prepared rigging points. The consultant samples the excavation as required. We manage impacted soil or water separately, then backfill, compact, and restore the surface.

Harrowgate coordinates shutdown, product transfer, excavation, lifting, environmental response, civil reinstatement, and records with one field schedule. Our crews control the work area and keep exposed equipment protected from traffic and weather. Owners receive practical daily reporting on recovered product, removed components, disposal documentation, discovered conditions, inspection points, and restored surfaces.

Materials, specs, and Ontario standards by Harrowgate Group

Materials, specs, and Ontario standards

Materials and acceptance criteria for storage tank removal come from the current Ontario requirements, approved drawings, consultant documents, receiving facilities, and owner standards that apply to the actual site. We check those criteria before procurement or hauling, record field changes, and preserve the evidence required for inspection, environmental review, and future construction.

TSSA's current environmental review material states that an underground tank is generally removed within two years of disuse under the Liquid Fuels Handling Code and within three years under the Fuel Oil Code, subject to the actual system and applicable requirements. Work follows the code currently adopted for the fuel, including Ontario adoption documents and CSA B139 series where applicable. Lift engineering uses verified tank dimensions, empty weight, residual allowance, rigging configuration, crane capacity at radius, and ground bearing.

Ontario fuel equipment is governed by the Technical Standards and Safety Authority framework and the code adopted for the fuel involved. Current requirements can include the Liquid Fuels Handling Code, its Ontario adoption document, or the CSA B139 series for oil burning equipment. Tank construction, supports, venting, fill, overfill protection, leak detection, corrosion protection, clearances, and contractor qualifications are confirmed against the approved design and current adopted edition.

What goes wrong, and how we prevent it by Harrowgate Group

What goes wrong, and how we prevent it

Storage Tank Removal fails when field production gets ahead of characterization, isolation, inspection, or documentation. Harrowgate prevents that gap with staged work, clearly marked hold points, segregated materials, daily records, and immediate escalation of changed conditions. The goal is to protect people and operations while avoiding rejected loads, concealed deficiencies, repeat excavation, and schedule loss.

Unexpected product in a supposedly empty line, trapped vapour, corroded lift points, concrete deadmen, saturated soil, and unknown piping are common hazards and schedule risks. Pulling before the consultant is ready can lose evidence at leak points. We verify isolation, test conditions, excavate exploratory windows, use rated rigging around sound bearing areas, and stage environmental response materials. The tank remains controlled until transported, and open excavations remain protected until sampling release and backfill completion.

We review the next two weeks of work against approvals, sampling, deliveries, shutdowns, and weather. Daily pre work discussions identify the exact limits and status of each area. Photographs and measurements are taken before concealment, and unresolved items stay visible on the field log until the responsible reviewer provides direction or acceptance.

Have drawings for storage tank removal? Send them over and we will scope it.

Call (416) 629-0721
FAQ

Storage Tank Removal FAQ

What information is needed before storage tank removal starts?

We start with tank type, product, capacity, location, piping, access, condition, and code status. We also confirm access, utilities, operating restrictions, consultant responsibilities, notices, and the intended endpoint. Resolving these items before mobilization lets the field team establish controls, receiving routes, hold points, and contingency space instead of making compliance decisions beside an open excavation.

What drives the schedule and scope for storage tank removal?

The main drivers are product transfer, cleaning, isolation, excavation, lifting, sampling, disposal, and restoration. Weather, laboratory turnaround, inspection availability, and working hours can also control production. We build the sequence around the slowest approval or physical constraint and identify parallel tasks that continue without covering work, mixing materials, or compromising a required hold point.

Which Ontario requirements apply to this work?

The governing requirements depend on the material, property, equipment, and approval. The work can involve the applicable TSSA fuel framework and currently adopted code for the system. We confirm the current project specific criteria with the engineer, Qualified Person, owner, municipality, or TSSA as applicable. A general industry practice never replaces the written requirement that governs the actual site.

How does Harrowgate document storage tank removal?

Our field record includes consultant sampling at tank base, ends, lines, dispensers, and visible release points. Entries are tied to dates and work areas so quantities and events can be reconstructed. We reconcile documents during the job, not only at closeout, which gives the owner and consultant time to correct a missing ticket, unclear location, or inconsistent quantity before demobilization.

How are unexpected site conditions handled?

We use cleaning, controlled atmosphere, verified isolation, and specified cutting procedure. Work pauses until the condition is safe, isolated, and assigned a documented response. The supervisor records what changed, where it occurred, who provided direction, and how material or equipment was controlled, preventing an unexpected discovery from contaminating accepted work or disappearing from the record.

Can the work proceed while the facility or project remains active?

Yes, where the design permits it. We plan dimensions, weight, residual allowance, crane radius, rigging, and ground bearing. The operating boundary, shutdown windows, truck route, emergency access, controls, and daily handback condition are agreed before work starts. Production is staged so facility staff and construction crews do not share uncontrolled access to the work zone.

What should be included in the final field record?

Closeout should include approved backfill, controlled lifts, density testing, and pavement or slab restoration. Depending on the project, it can also include photographs, surveys, receiving records, inspection releases, operating logs, test results, redline drawings, and a list of remaining assets. The package supports the owner's consultant and operations team, but professional certifications remain with the appropriately qualified person.

Still have a question about storage tank removal? Ask our team directly.

Call (416) 629-0721
Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for storage tank removal

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.

(416) 629-0721

Licensed, Insured & WSIB-Covered, work managed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call now (416) 629-0721