Soil Remediation

Harrowgate Group completes soil remediation directly for developers, industrial owners, general contractors, and municipalities across Toronto, the GTA, and Ontario, with the equipment, field controls, documentation, and civil restoration kept under one accountable construction team.

(416) 629-0721
  • Licensed, Insured & WSIB-Covered
  • 20 Years in Business

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721
20 Years in Business
Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Completed on site and built to the drawings Performed & installed on site across Ontario
Why Harrowgate Group

What to expect from soil remediation

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.

Made to last

Durable materials and methods chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How we plan and deliver soil remediation

Soil remediation removes, treats, contains, or otherwise controls contaminated soil so a Toronto or GTA property can meet its approved construction and environmental objectives. Harrowgate carries out the excavation, segregation, treatment support, hauling, backfill, and restoration directly, under project plans and sampling directions established with the owner's Qualified Person.

  1. 01 Send your inquiry, a few photos or a description of the site.
  2. 02 We come out, assess the site, take measurements, and confirm the scope.
  3. 03 We complete the soil remediation on site, to the load and finish the job needs.
  4. 04 We install it, finish to grade, and clean up, one accountable crew, start to finish.
Soil Remediation being built and completed on site by Harrowgate Group
Local Context

A closer look at soil remediation

Scope

Understanding soil remediation

How we complete soil remediation by Harrowgate Group

How we complete soil remediation

Our soil remediation sequence starts with verified site information, controlled work zones, and written acceptance points, then moves through field execution, consultant inspection, records, and restoration. We assign each material, asset, sample area, and load a defined status so crews know what can move, what must remain exposed, and who releases the next step.

We mobilize secure stockpile cells, equipment decontamination, dust and runoff controls, truck staging, and any required shoring or water management. Excavation advances in lifts so soil condition, odour, staining, and field screening can be compared with the conceptual site model. Suspect changes are isolated and referred to the Qualified Person before they are blended or moved.

We segregate by soil quality and destination, maintain load counts, and expose excavation faces for confirmation sampling. After the consultant releases the limits, we place approved backfill in controlled lifts, compact to the project requirement, and restore subgrade for the next construction activity.

Our field supervisors keep excavation, water handling, trucking, imported materials, survey, and environmental hold points on the same daily plan. We record quantities, load destinations, unexpected conditions, and completed limits as the work advances. That discipline gives the owner and Qualified Person a clean record of what happened below grade, where it happened, and what remains for acceptance.

Materials, specs, and Ontario standards by Harrowgate Group

Materials, specs, and Ontario standards

Materials and acceptance criteria for soil remediation come from the current Ontario requirements, approved drawings, consultant documents, receiving facilities, and owner standards that apply to the actual site. We check those criteria before procurement or hauling, record field changes, and preserve the evidence required for inspection, environmental review, and future construction.

Stockpiles are built on a compatible low permeability base, covered against precipitation and dust, bermed where runoff could leave the cell, and identified by source area and status. Loads use documented destinations and soil characterization appropriate to the receiving site. Imported granular and engineered fill are supported by source documentation and placed to the geotechnical specification, commonly in lift thicknesses suited to the selected compactor and tested density. Where excavation approaches structures or services, the shoring design and locate information set the working limits.

Ontario Regulation 153/04 governs the assessment and evidence used for many Records of Site Condition. The applicable numerical standard depends on property use, groundwater use, soil texture, depth, and whether the project follows generic or accepted risk based criteria. We execute to the Qualified Person's written criteria and preserve traceability. Ontario Regulation 406/19 and the Rules for Soil Management apply when excavated soil becomes excess soil.

What goes wrong, and how we prevent it by Harrowgate Group

What goes wrong, and how we prevent it

Soil Remediation fails when field production gets ahead of characterization, isolation, inspection, or documentation. Harrowgate prevents that gap with staged work, clearly marked hold points, segregated materials, daily records, and immediate escalation of changed conditions. The goal is to protect people and operations while avoiding rejected loads, concealed deficiencies, repeat excavation, and schedule loss.

The costliest failures are underestimating the plume, mixing soil classes, hauling before acceptance, allowing rain into an open cut, and backfilling before confirmation results release the excavation. These errors create repeat excavation, rejected loads, water treatment, and lost schedule. We use staged excavation, separate stockpile IDs, visible hold points, daily quantity reconciliation, and weather planning. Equipment travels from cleaner to more impacted zones where practical, and buckets, tracks, and truck contact surfaces are cleaned before they can carry soil across the site.

We review the next two weeks of work against approvals, sampling, deliveries, shutdowns, and weather. Daily pre work discussions identify the exact limits and status of each area. Photographs and measurements are taken before concealment, and unresolved items stay visible on the field log until the responsible reviewer provides direction or acceptance.

Have drawings for soil remediation? Send them over and we will scope it.

Call (416) 629-0721
FAQ

Soil Remediation FAQ

What information is needed before soil remediation starts?

We start with delineation and applicable site condition criteria. We also confirm access, utilities, operating restrictions, consultant responsibilities, notices, and the intended endpoint. Resolving these items before mobilization lets the field team establish controls, receiving routes, hold points, and contingency space instead of making compliance decisions beside an open excavation.

What drives the schedule and scope for soil remediation?

The main drivers are excavation volume, soil class, water, shoring, haul distance, and receiving acceptance. Weather, laboratory turnaround, inspection availability, and working hours can also control production. We build the sequence around the slowest approval or physical constraint and identify parallel tasks that continue without covering work, mixing materials, or compromising a required hold point.

Which Ontario requirements apply to this work?

The governing requirements depend on the material, property, equipment, and approval. The work can involve confirmation sampling by the Qualified Person before backfill. We confirm the current project specific criteria with the engineer, Qualified Person, owner, municipality, or TSSA as applicable. A general industry practice never replaces the written requirement that governs the actual site.

How does Harrowgate document soil remediation?

Our field record includes segregated stockpiles, covered cells, load records, and authorized destinations. Entries are tied to dates and work areas so quantities and events can be reconstructed. We reconcile documents during the job, not only at closeout, which gives the owner and consultant time to correct a missing ticket, unclear location, or inconsistent quantity before demobilization.

How are unexpected site conditions handled?

We use staged excavation and field change control. Work pauses until the condition is safe, isolated, and assigned a documented response. The supervisor records what changed, where it occurred, who provided direction, and how material or equipment was controlled, preventing an unexpected discovery from contaminating accepted work or disappearing from the record.

Can the work proceed while the facility or project remains active?

Yes, where the design permits it. We plan approved imported fill, lift placement, density testing, and survey records. The operating boundary, shutdown windows, truck route, emergency access, controls, and daily handback condition are agreed before work starts. Production is staged so facility staff and construction crews do not share uncontrolled access to the work zone.

What should be included in the final field record?

Closeout should include unexpected odour, staining, free product, buried tanks, or suspect fill. Depending on the project, it can also include photographs, surveys, receiving records, inspection releases, operating logs, test results, redline drawings, and a list of remaining assets. The package supports the owner's consultant and operations team, but professional certifications remain with the appropriately qualified person.

Still have a question about soil remediation? Ask our team directly.

Call (416) 629-0721
Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for soil remediation

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.

(416) 629-0721

Licensed, Insured & WSIB-Covered, work managed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call now (416) 629-0721