Built to spec
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Harrowgate Group completes soil remediation directly for developers, industrial owners, general contractors, and municipalities across Toronto, the GTA, and Ontario, with the equipment, field controls, documentation, and civil restoration kept under one accountable construction team.
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Durable materials and methods chosen for the load, traffic, and environment on site.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Soil remediation removes, treats, contains, or otherwise controls contaminated soil so a Toronto or GTA property can meet its approved construction and environmental objectives. Harrowgate carries out the excavation, segregation, treatment support, hauling, backfill, and restoration directly, under project plans and sampling directions established with the owner's Qualified Person.
Our soil remediation sequence starts with verified site information, controlled work zones, and written acceptance points, then moves through field execution, consultant inspection, records, and restoration. We assign each material, asset, sample area, and load a defined status so crews know what can move, what must remain exposed, and who releases the next step.
We mobilize secure stockpile cells, equipment decontamination, dust and runoff controls, truck staging, and any required shoring or water management. Excavation advances in lifts so soil condition, odour, staining, and field screening can be compared with the conceptual site model. Suspect changes are isolated and referred to the Qualified Person before they are blended or moved.
We segregate by soil quality and destination, maintain load counts, and expose excavation faces for confirmation sampling. After the consultant releases the limits, we place approved backfill in controlled lifts, compact to the project requirement, and restore subgrade for the next construction activity.
Our field supervisors keep excavation, water handling, trucking, imported materials, survey, and environmental hold points on the same daily plan. We record quantities, load destinations, unexpected conditions, and completed limits as the work advances. That discipline gives the owner and Qualified Person a clean record of what happened below grade, where it happened, and what remains for acceptance.
Materials and acceptance criteria for soil remediation come from the current Ontario requirements, approved drawings, consultant documents, receiving facilities, and owner standards that apply to the actual site. We check those criteria before procurement or hauling, record field changes, and preserve the evidence required for inspection, environmental review, and future construction.
Stockpiles are built on a compatible low permeability base, covered against precipitation and dust, bermed where runoff could leave the cell, and identified by source area and status. Loads use documented destinations and soil characterization appropriate to the receiving site. Imported granular and engineered fill are supported by source documentation and placed to the geotechnical specification, commonly in lift thicknesses suited to the selected compactor and tested density. Where excavation approaches structures or services, the shoring design and locate information set the working limits.
Ontario Regulation 153/04 governs the assessment and evidence used for many Records of Site Condition. The applicable numerical standard depends on property use, groundwater use, soil texture, depth, and whether the project follows generic or accepted risk based criteria. We execute to the Qualified Person's written criteria and preserve traceability. Ontario Regulation 406/19 and the Rules for Soil Management apply when excavated soil becomes excess soil.
Soil Remediation fails when field production gets ahead of characterization, isolation, inspection, or documentation. Harrowgate prevents that gap with staged work, clearly marked hold points, segregated materials, daily records, and immediate escalation of changed conditions. The goal is to protect people and operations while avoiding rejected loads, concealed deficiencies, repeat excavation, and schedule loss.
The costliest failures are underestimating the plume, mixing soil classes, hauling before acceptance, allowing rain into an open cut, and backfilling before confirmation results release the excavation. These errors create repeat excavation, rejected loads, water treatment, and lost schedule. We use staged excavation, separate stockpile IDs, visible hold points, daily quantity reconciliation, and weather planning. Equipment travels from cleaner to more impacted zones where practical, and buckets, tracks, and truck contact surfaces are cleaned before they can carry soil across the site.
We review the next two weeks of work against approvals, sampling, deliveries, shutdowns, and weather. Daily pre work discussions identify the exact limits and status of each area. Photographs and measurements are taken before concealment, and unresolved items stay visible on the field log until the responsible reviewer provides direction or acceptance.
Have drawings for soil remediation? Send them over and we will scope it.
We start with delineation and applicable site condition criteria. We also confirm access, utilities, operating restrictions, consultant responsibilities, notices, and the intended endpoint. Resolving these items before mobilization lets the field team establish controls, receiving routes, hold points, and contingency space instead of making compliance decisions beside an open excavation.
The main drivers are excavation volume, soil class, water, shoring, haul distance, and receiving acceptance. Weather, laboratory turnaround, inspection availability, and working hours can also control production. We build the sequence around the slowest approval or physical constraint and identify parallel tasks that continue without covering work, mixing materials, or compromising a required hold point.
The governing requirements depend on the material, property, equipment, and approval. The work can involve confirmation sampling by the Qualified Person before backfill. We confirm the current project specific criteria with the engineer, Qualified Person, owner, municipality, or TSSA as applicable. A general industry practice never replaces the written requirement that governs the actual site.
Our field record includes segregated stockpiles, covered cells, load records, and authorized destinations. Entries are tied to dates and work areas so quantities and events can be reconstructed. We reconcile documents during the job, not only at closeout, which gives the owner and consultant time to correct a missing ticket, unclear location, or inconsistent quantity before demobilization.
We use staged excavation and field change control. Work pauses until the condition is safe, isolated, and assigned a documented response. The supervisor records what changed, where it occurred, who provided direction, and how material or equipment was controlled, preventing an unexpected discovery from contaminating accepted work or disappearing from the record.
Yes, where the design permits it. We plan approved imported fill, lift placement, density testing, and survey records. The operating boundary, shutdown windows, truck route, emergency access, controls, and daily handback condition are agreed before work starts. Production is staged so facility staff and construction crews do not share uncontrolled access to the work zone.
Closeout should include unexpected odour, staining, free product, buried tanks, or suspect fill. Depending on the project, it can also include photographs, surveys, receiving records, inspection releases, operating logs, test results, redline drawings, and a list of remaining assets. The package supports the owner's consultant and operations team, but professional certifications remain with the appropriately qualified person.
Still have a question about soil remediation? Ask our team directly.
Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.
Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.
Licensed, Insured & WSIB-Covered, work managed and documented on every job
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Harrowgate Group provides soil remediation, delivered and installed with quote-ready support across Toronto and surrounding Ontario communities.