Ontario excess soil rules and record-keeping checker
Answer a few questions about a soil removal project, or about a site that receives soil, to see which parts of Ontario Regulation 406/19 apply and which records to keep. Every item is tied to its section of the regulation.
We manage excess soil, supply and dispose of clean fill, and remove contaminated soil across Ontario. Related services: Excess soil management, Clean fill supply and disposal, Contaminated soil removal. Request a quote.
Results are for preliminary planning only. They are not a quote, a design or an engineering opinion. The engineer of record, the governing specification and the conditions on site decide what applies to your project.
Use this tool from any AI assistant
Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.
All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.
How the checker decides
- Notice exempt (Schedule 2, paragraph 1): not an enhanced investigation area, not a remediation project, and under 2,000 m³ where any part of the area is in an area of settlement.
- Notice exempt (paragraph 2): under 100 m³ going directly to a waste disposal site that is not a Class 2 soil management site.
- Notice exempt (paragraph 3): excavation for an urgent reason listed in the Schedule.
- Reports not required (section 14): the whole area is agricultural or other use, or residential, parkland or institutional with the soil not going to an agricultural or other use reuse site, and no known contaminant discharge.
- Sampling plan (section 12): required if a potentially contaminating activity is found or the area is or was an enhanced investigation area, except for soil going to a Class 1 site.
- Reuse site notice (section 19): 10,000 m³ or more expected, unless part of an infrastructure undertaking.
Worked example
A project leader removes 3,000 m³ from a commercial lot in an area of settlement. There is no industrial or fuel history and it is not a remediation project. The volume is over 2,000 m³, so Schedule 2 paragraph 1 does not apply. The notice is required before removal, with an assessment of past uses, a destination assessment report, a tracking system and a Registry update within 30 days after the last soil leaves. A sampling plan is needed only if the past-use assessment finds a potentially contaminating activity.
Sections used
| Section | Subject |
|---|---|
| 3, 4, 5 | When excess soil is not designated waste; reuse site conditions |
| 8, 9, Schedule 1, Schedule 2 | Registry notice, 30-day update, content, exemptions |
| 11, 12, 13, 14, 15 | Assessment of past uses, sampling plan, characterization and destination reports, exceptions, updates |
| 16, 18 | Tracking system, hauling records |
| 19 | Reuse site notice and load accounting at 10,000 m³ or more |
| 23 | Procedure if contamination is suspected during digging |
| 28 | Record retention: 7 years, 2 years for hauling records |
Sources
- Ontario Regulation 406/19, On-Site and Excess Soil Management, e-Laws, sections and schedules as listed above.
Last checked 2026-11-09. The regulation refers to the Soil Rules, the Excess Soil Quality Standards and the Registry forms, which set the detail and were not read for this tool, and to Ontario Regulation 153/04 for the land use and qualified person definitions. Confirm with your qualified person or the Ministry of the Environment, Conservation and Parks.
Need volumes? See our excavation and spoil volume calculator.
Request an excess soil management quote
This tool shows which rules apply. A quote also reflects the volume, testing, hauling, destination and the qualified person involved. Send us the scope and we will arrange a site review.
We manage excess soil, supply and dispose of clean fill, and remove contaminated soil across Ontario. Related services: Excess soil management, Clean fill supply and disposal, Contaminated soil removal. Request a quote.
Cite this tool
Copy this HTML to link to the tool from your own page. All of our free planning tools are listed together.
Excess soil FAQ
When does a project have to file a notice in the Excess Soil Registry?
Under section 8 of Ontario Regulation 406/19 the project leader files a notice before removing soil from the project area, unless a Schedule 2 exemption applies. The main one: the area is not and never was an industrial use, garage, bulk liquid dispensing facility (including a gasoline outlet) or dry cleaner, the project is not mainly to remediate contaminated land, and, for an area in an area of settlement under the Planning Act, less than 2,000 cubic metres will be removed. Other exemptions cover under 100 cubic metres going directly to a waste disposal site that is not a Class 2 soil management site, and certain urgent or topsoil cases.
What documents does a qualified person prepare?
Where the notice is required: an assessment of past uses (section 11), a sampling and analysis plan with a soil characterization report where a potentially contaminating activity is found or the area is or was an enhanced investigation area (section 12), and an excess soil destination assessment report (section 13). Section 14 relieves the project leader of these where the whole area is residential, parkland, institutional, or agricultural or other use, subject to conditions.
What is a reuse site and what must it do?
A reuse site is a site where excess soil is used for a beneficial purpose. Soil sent there avoids being designated waste only if the criteria in section 3 are met, including written consent from the site owner or operator, dry soil, and the quality and quantity conditions of section 4 (a governing instrument) or section 5 (no instrument). Where 10,000 cubic metres or more is expected, section 19 also requires a Registry notice and load accounting before the first load, unless the site is part of an infrastructure undertaking.
How long do I keep the records?
Section 28 requires a project leader, a project area operator and the owner or operator of a reuse site, Class 1 site, landfill or dump to keep documents and records created or acquired under the regulation for at least seven years. Contracts about managing or hauling excess soil are kept seven years from the contract date. The hauling record is kept at least two years after loading.
Does this tool say whether my soil is clean enough?
No. Quality is judged against the Excess Soil Quality Standards in the Rules for Soil Management and Excess Soil Quality Standards, using sampling and analysis done by a qualified person. This tool covers which parts of the regulation apply and what to keep, not the test results.