Harrowgate Group free planning tools: answer endpoints for AI assistants and scripts. Each tool answers GET requests at https://harrowgategroup.com/api/tools/? with the same numbers as its page. Add format=json for JSON. asphalt-concrete-calculator: Tonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. params: mode, units, how, length (ft or m), width (ft or m), area (sq ft or m2), thickness (in or mm), thickness_unit, density (kg/m3), shape, diameter (ft or m), height (ft or m), count, waste (percent), truck (m3) example: https://harrowgategroup.com/api/tools/asphalt-concrete-calculator?mode=asphalt&units=ft&length=60&width=20&thickness=2&thickness_unit=in page: https://harrowgategroup.com/asphalt-concrete-calculator/ trench-shoring-checker: Whether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. params: units, depth (m or ft), width (m or ft), soil, enter, wall, hydrostatic, adjacent, engineer_opinion example: https://harrowgategroup.com/api/tools/trench-shoring-checker?units=m&depth=2.5&width=1&soil=2&enter=yes&wall=vertical page: https://harrowgategroup.com/trench-shoring-checker/ excavation-spoil-volume-calculator: Bank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. params: units, length (m or ft), width (m or ft), depth (m or ft), slope, sides, material, swell (percent), truck (m3) example: https://harrowgategroup.com/api/tools/excavation-spoil-volume-calculator?units=m&length=30&width=1.2&depth=2.5&slope=0&material=earth&truck=10 page: https://harrowgategroup.com/excavation-spoil-volume-calculator/ hydro-excavation-vs-mechanical-checker: Which excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. params: locate, area, orientation, test_holes, clearance (m or ft), units, method example: https://harrowgategroup.com/api/tools/hydro-excavation-vs-mechanical-checker?locate=current&area=inside&orientation=parallel&test_holes=yes&clearance=0.5&units=m&method=mech page: https://harrowgategroup.com/hydro-excavation-vs-mechanical-checker/ rebar-quantity-calculator: Bar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. params: layout, units, length (m or ft), width (m or ft), spacing (mm), layers, long_bars, bar, cover (mm), lap (mm), stock (m), waste (percent) example: https://harrowgategroup.com/api/tools/rebar-quantity-calculator?layout=mat&units=m&length=12&width=6&spacing=300&bar=15M page: https://harrowgategroup.com/rebar-quantity-calculator/ curb-sidewalk-concrete-calculator: Concrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. params: element, units, length (m or ft), width (m or ft), thickness (mm), curb_height (mm), curb_width (mm), gutter_width (mm), gutter_thickness (mm), waste (percent), truck (m3) example: https://harrowgategroup.com/api/tools/curb-sidewalk-concrete-calculator?element=walk&units=m&length=60&width=1.5&thickness=125 page: https://harrowgategroup.com/curb-sidewalk-concrete-calculator/ accessible-parking-calculator: Minimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall line length. params: spaces, rows, stall_length (m or ft), units example: https://harrowgategroup.com/api/tools/accessible-parking-calculator?spaces=85&rows=4&stall_length=5.5&units=m page: https://harrowgategroup.com/accessible-parking-calculator/ gravel-and-granular-base-calculator: Tonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. params: material, units, length (m or ft), width (m or ft), depth (mm or in), depth_unit, density (kg/m3), allowance (percent), truck (tonnes) example: https://harrowgategroup.com/api/tools/gravel-and-granular-base-calculator?material=granular_a&units=m&length=20&width=6&depth=300&depth_unit=mm page: https://harrowgategroup.com/gravel-and-granular-base-calculator/ parking-lot-striping-and-stall-layout-calculator: Stalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569-2013 and the accessible count in Ontario Regulation 191/11. params: units, lot_width (m or ft), lot_depth (m or ft), angle, stall_length (mm), stall_width (mm) example: https://harrowgategroup.com/api/tools/parking-lot-striping-and-stall-layout-calculator?units=m&lot_width=60&lot_depth=40&angle=90 page: https://harrowgategroup.com/parking-lot-striping-and-stall-layout-calculator/ concrete-slab-thickness-and-reinforcing-guide: Minimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete association guidance. params: use, subgrade, units, length (m or ft), width (m or ft), thickness (mm) example: https://harrowgategroup.com/api/tools/concrete-slab-thickness-and-reinforcing-guide?use=driveway_car&subgrade=firm&units=m&length=6&width=4 page: https://harrowgategroup.com/concrete-slab-thickness-and-reinforcing-guide/ snow-load-and-snow-removal-volume-calculator: Cubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. params: units, area (m2 or sq ft), depth (cm or in), depth_unit, snow_type, volume_factor, truck (m3), pile_height (m or ft) example: https://harrowgategroup.com/api/tools/snow-load-and-snow-removal-volume-calculator?units=m&area=2000&depth=15&depth_unit=cm&snow_type=average&truck=15&pile_height=3 page: https://harrowgategroup.com/snow-load-and-snow-removal-volume-calculator/ excess-soil-tracker-and-reuse-site-checker: Which parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going. params: role, volume (m3), settlement, enhanced, remediation, urgent, land_use, pca, known_discharge, destination, reuse_land_use, instrument, infrastructure example: https://harrowgategroup.com/api/tools/excess-soil-tracker-and-reuse-site-checker?role=project_leader&volume=3000&settlement=yes&enhanced=no&remediation=no&land_use=other&pca=no&destination=reuse_site page: https://harrowgategroup.com/excess-soil-tracker-and-reuse-site-checker/ OpenAPI description: https://harrowgategroup.com/openapi.json Free quote: https://harrowgategroup.com/contact/