Contractor for Concrete Slab: What to Check Before You Hire
Hiring a contractor for concrete slab work in Ontario? Check the written scope, WSIB clearance, scanning, pour plan and floor flatness before you sign.
When you choose a contractor for concrete slab work in Ontario, check five things before you sign: a written scope that names thickness, finish and joints; a WSIB clearance you verify yourself; a plan for what is hidden in or under the ground; a pour and curing plan for the season; and how the finished floor will be measured. A low number on a vague scope is the usual way a slab job goes wrong.
This guide is for owners, property managers and general contractors who are choosing who will place a commercial slab. It gives you the checks to make, what each one protects you from and what to have ready. If you want to see the kind of work we place, start with our commercial concrete slabs page.
What should a contractor for concrete slab work put in writing?
A slab quote should state what is being built in words you can compare line by line. If two bidders describe different slabs, their numbers cannot be compared, so settle the scope first and then the number.
| Item | What to ask | Why it matters |
|---|---|---|
| Thickness and base | Is it shown on the engineer's or architect's drawings, and does the quote follow them? | Thickness is designed from loads and the soil under the slab, not chosen by habit. |
| Reinforcing | What steel, where, and who supplies and places it? | Placement and cover are part of the structure; see our rebar supply and installation service. |
| Joints | Where will control joints go, and when will they be cut? | Joints decide where the slab cracks as it shrinks. |
| Finish | Broom, trowel, hardener or sealer, and what flatness is expected? | A finish that suits a loading area is different from one for a showroom. |
| Exclusions | What is not included: demolition, removals, locates, testing, protection? | Exclusions are where a low quote catches up later. |
If you are not sure what thickness and joint spacing a slab needs, our free concrete slab thickness, joints and reinforcing guide shows the published figures with their sources. It is a guide, not a design: your engineer's drawings decide.
How do you check a contractor's WSIB clearance?
The WSIB describes a clearance as a unique number issued to registered businesses in good standing, valid for up to 90 days. You can look the number up on the WSIB clearances page without a login, which is better than accepting a document the contractor sends you.
Check the name on the clearance against the name on the quote and the contract. Then check the date: a job that starts inside a clearance period and runs past 90 days needs a fresh clearance. Ask for proof of liability insurance too, and read what it covers rather than only that it exists.
Licensed, insured and covered by WSIB are the basics. They are not proof of quality, which is why the remaining checks matter. For a longer list of questions about supervision, safety and closeout, see our post on questions to ask before hiring a commercial concrete contractor.
What is hidden in or under the slab, and who finds it?
Ontario Dig Authority states that you must request a public utility locate before you dig, and that single address requests are completed within 5 business days and advanced requests, for multiple addresses or larger work areas, within 10 business days. Build that time into the schedule before you set a pour date.
Ask the contractor who requests the locate, who waits for every infrastructure owner to respond, and what happens if the project changes. Ontario Dig Authority says to request a new locate if your project changes.
Locates cover public utilities. They do not tell you what is inside an existing slab. Where a new slab ties into an old one, or where you will cut or core, ask how the contractor finds conduit, reinforcing steel and post-tension cables first. Coring or cutting without a scan risks striking those items. Our GPR concrete scanning service marks them on the surface, and our comparison of GPR and concrete X-ray explains how the methods differ. Openings in an existing slab are done through concrete cutting and coring.
What should the pour and curing plan cover?
Joints are cut on a clock. The American Concrete Institute says saw cuts are typically made 4 to 12 hours after placing a slab, depending on temperature and weather, early enough to beat random shrinkage cracks but late enough that the surface does not ravel. Its guidance on when to saw cut adds that conventional cuts should generally reach one quarter of the slab depth and that hot weather may call for cuts within about 1 hour.
That is why a pour plan matters more than a rate. A contractor who has thought about your slab should be able to tell you:
- The pour sequence: how many pours, in what order, and where the construction joints fall.
- The crew and equipment: enough finishers for the area and the weather, and how the concrete reaches the slab, by chute, pump or buggy.
- Joint timing: who cuts the joints, with what saw, and when.
- Curing and protection: how the slab is kept from drying too fast or freezing.
- Weather limits: the conditions in which the contractor will not pour.
Season changes the answers. If your pour falls between late fall and spring, read our guide to winter concrete pouring in Ontario and ask how the contractor will protect the slab.
How will the finished floor be measured?
Flatness is a number, not an opinion. ASTM E1155 is the test method that estimates a floor's FF flatness and FL levelness numbers from surface measurements, as described on the ASTM E1155 standard page. If a floor carries racking, forklifts or machinery, the specification should name the FF and FL numbers, who measures them and when.
Most walk and parking slabs do not need a flatness target. A warehouse or industrial floor often does. Ask the contractor whether they have placed floors to a stated FF and FL, and how they will check the result. Our structural concrete work is done to the engineer's drawings and specification.
Which contractor suits which slab?
| Slab | Look for | Common mistake |
|---|---|---|
| Warehouse or industrial floor | Floors placed to stated FF and FL numbers, joint plan, curing plan | Leaving flatness out of the scope |
| Parking lot or truck pad | Drawings for thickness and base, drainage, joint layout | Choosing a thickness from a rule of thumb |
| Loading area or equipment pad | Reinforcing detail, edge treatment, locates | No locate or scan before excavation |
| Slab tied into an existing building | A scan of the old slab, a plan for dowels and joints | Cutting or drilling before finding what is inside |
What does a good bid comparison look like?
Send every bidder the same drawings, the same scope and the same questions, and compare answers, not only totals. A bid that skips locates, scanning, joints or curing has not removed those costs. It has moved them to you.
Ask each bidder for the same short package: the WSIB clearance number, the insurance certificate, the pour plan, the schedule with any weather limits, and a written list of exclusions. Payment terms and the holdback on a construction contract are governed by Ontario's Construction Act, so have your lawyer review the contract for anything beyond the scope.
Our cost posts explain the range of what drives a slab's price without quoting ours; see commercial concrete cost in Ontario if you are still budgeting.
What should you have ready for a written quote?
- Drawings or a sketch with the slab size, the thickness and the level you need to match.
- What the slab will carry: vehicles, racking, equipment or foot traffic.
- Any geotechnical report or survey for the site.
- The finish and any flatness number in the specification.
- Access for trucks, a washout and where concrete can be staged.
- Your target dates, and whether the pour falls in cold weather.
Ready to compare? Send us the drawings and the scope and we will respond with questions and a written quote, or review the commercial concrete slabs page first.
Frequently asked questions
How do I know a contractor for concrete slab work is covered by WSIB?
Ask for the contractor's WSIB clearance number and look it up yourself rather than relying on a paper copy. The WSIB describes a clearance as a unique number issued to registered businesses in good standing, and says it is valid for up to 90 days, so check it again if the job runs longer.
Does a commercial concrete slab need a locate before the work starts?
Yes, if the work involves digging or disturbing the ground, such as stripping, trenching for underslab services or cutting the base. Ontario Dig Authority says a locate must be requested before you dig. Single address requests are completed within 5 business days and larger or multi address projects within 10 business days, so book the locate before you set a start date.
Should a slab be scanned before it is cut or cored?
Yes. Cutting or coring a slab without finding what is inside it first risks hitting conduit, post-tension cables or reinforcing steel. A GPR scan marks those items on the surface before any blade or bit touches the concrete.
What are FF and FL numbers on a concrete floor?
They are the two numbers used to describe how flat (FF) and how level (FL) a floor surface is. ASTM E1155 is the test method that estimates them from measured elevations. If your floor needs a flatness target for racking or machinery, the specification should name the numbers and who measures them.
How soon after a pour are joints cut in a slab?
The American Concrete Institute says saw cuts are typically made 4 to 12 hours after placing, depending on temperature and weather, early enough to get ahead of random shrinkage cracks but late enough that the surface does not ravel. Hot weather can call for cuts within about 1 hour of placement. Ask a contractor how they plan the timing for your pour date.