Blocks for Retaining Wall: Block, Poured or Armour Stone
Choosing blocks for retaining wall work in Ontario: how segmental block, poured concrete and armour stone compare and when an engineer's design is needed.
The best blocks for retaining wall work depend on height, load and who can reach the wall. In Ontario, segmental concrete blocks suit most low and medium walls, poured concrete suits tight sites and heavy loads, and armour stone suits a heavy natural face. Any wall over 1,000 mm next to public areas needs an engineer's design.
Most walls that fail were not the wrong material. They were the wrong material for the height, the soil and the water behind them. This guide helps you choose between concrete blocks for retaining wall use, poured concrete and armour stone, and shows where the Ontario rules change the answer. If your wall is part of a commercial site, our engineered retaining walls team builds all three types.
Which wall type suits which job?
Match the wall to the situation first, then to the look. The table summarises the decision.
| Option | Best for | Limits | Time and cost drivers | Rule that applies |
|---|---|---|---|---|
| Segmental concrete block | Long, gently curved walls, landscaped edges, grade changes with room for a crew | Taller walls need geogrid tied into the soil and more excavation behind the face | Excavation depth, base prep, geogrid layers, access for materials | Over 1,000 mm and adjacent to public areas: designated structure, Part 4 design |
| Poured concrete | Tight property lines, loading areas, walls carrying a driveway or parking | Needs formwork, steel and curing time, and cold weather planning | Forming, rebar, footing size, curing time, pump or truck access | Same designated structure rule; reinforced concrete is designed by the engineer |
| Armour stone | A heavy natural face, large grade changes, creek and stormwater edges | Needs an excavator and a laydown area; joints must be tight and backfilled | Stone size, delivery, equipment access, base and drainage stone | Often specified by the municipality for its own work; still designated above 1,000 mm adjacent to public areas |
What are the Ontario rules for a wall over one metre?
Under the Ontario Building Code, a retaining wall exceeding 1,000 mm in exposed height next to public property, access to a building, or private property the public is admitted to is a designated structure. The designation sits in Division A, Article 1.3.3.5 of the 2024 Building Code compendium, and Article 1.3.3.2 applies Part 4 (structural design) of Division B to it.
The Code does not define "adjacent to". The Town of Erin's retaining wall guide says so directly and works through examples, including a 2 m wall at the back of a lot beside a public park, which it treats as a designated structure even though the wall sits on private land. Barrie's building services sheet of September 2024 defines "adjacent to" as a horizontal distance equal to or less than the wall's height, and says a professional engineer licensed in Ontario must provide design confirming compliance with Part 4 of the Building Code for the wall and its guard. Where a wall is near a lot line, that definition often decides whether you need a permit.
Toronto spells it out for owners. Its building permit guidance says a permit is required to construct a retaining wall more than one metre high on or adjacent to public property (including streets), building entrances, and private property accessible to the public. It is not required for a wall on private property that is not accessible to the public and is under one metre at every point. The same page adds that compliance with the Zoning By-law is required even when no permit is.
Local sources differ in detail, so confirm the rule with your own building department before you order materials. For commercial work we coordinate drawings with the engineer and the city, and we offer engineered retaining walls in Toronto, in Mississauga and in Vaughan, where the permit steps differ.
How do segmental concrete blocks work as a retaining wall?
A segmental block wall stays up through the weight of its units and, in taller walls, through layers of geogrid that tie the face to the soil behind it. These are purpose made concrete blocks for retaining wall use, with a lip, pin or key that locks each course to the one below, and a setback so the wall leans slightly back into the soil.
Plain hollow masonry units are not the same thing. They are not made to hold soil, to take the freeze and thaw cycles of an Ontario winter on a wet face, or to be tied back with geogrid. If a supplier is offering ordinary building block for a wall that holds soil, ask who designed the wall and for what loads.
What decides how tall a block wall can go?
Soil, water and what sits on top. A wall that carries only a lawn is a different design from one that carries a parking lot, a driveway or a stockpile. Added load behind the face is called a surcharge, and it is a standard reason a wall moves from a landscape wall to an engineered wall.
When is poured concrete the better choice?
Choose poured concrete when there is no room for the excavation behind a block wall, when the wall carries heavy loads, or when the wall is part of a larger structure such as a loading dock or a foundation. A reinforced concrete wall is one piece, with a stem and a footing, and the engineer designs steel and thickness for the load.
The trade-off is site work. Poured walls need forming, reinforcing steel, concrete delivery and curing. In cold weather they also need planning, so read our guide to winter concrete pouring in Ontario before you schedule a late fall wall. If you are weighing site cast against factory made pieces, see cast-in-place vs precast concrete. We place and finish this work through our structural concrete and concrete foundation services.
What should you know about armour stone?
The City of Brampton's landscape specification for armour stone sets a useful picture of a proper installation. Its section 04400 for armour stone calls for squared natural limestone of about 800 mm wide by 600 mm tall by 1,000 mm long unless noted, tight joints staggered from course to course, filter fabric under and behind the stone, and Type 1 granular fill (19 mm crusher run limestone). It also requires the excavation to be inspected and approved before the stone is placed.
Armour stone does not rely on an interlocking system. Its weight holds the soil, and the quality of the base and the backfill decides whether it settles. Gaps between stones that are left unfilled can cause settlement or washout, which is why the specification has them filled. The practical limit is access: you need an excavator, a place to stage stone and a firm route for delivery.
Why does drainage matter more than the block?
Water pressure behind a wall is a common cause of leaning, bulging and cracking, so every wall type needs a way for that water to leave. A drained backfill of clear crushed stone, filter fabric to keep fines out, and an outlet are standard features in the designs we build, whatever face material you choose. Our guide on how a French drain works shows how that drainage layer carries water away, and French drain vs weeping tile explains how a drain behind a wall differs from the foundation drain at a footing.
- Free draining stone directly behind the wall, wrapped in filter fabric.
- A drain outlet at the base that carries water to a safe place, not behind a neighbour's wall.
- Surface grading that sends rain away from the top of the wall.
- Frost thinking in the base and footing, since Ontario soil freezes and moves.
What do you check before the dig?
Locate buried services and any structure inside the wall's zone of influence before you open the ground. We scan slabs and soil with GPR concrete scanning where there is a question about what lies below, and deep or tight excavations may need excavation shoring. Our post on shoring vs underpinning explains how temporary support differs from permanent support.
The wall is only as good as the base it sits on, so the soil and groundwater at the site come first. If the wall is near an existing building, the engineer must account for the load the building puts on the soil.
What should you have ready for a quote?
- A site plan with the lot line, the wall location and any buildings, entrances or public sidewalks next to it.
- The height at the tallest point, and the grade above and below the wall.
- What sits above the wall: lawn, a driveway, parking, a building or stored material.
- Any geotechnical report, survey or earlier engineer drawing.
- Your timing, since concrete and excavation work depend on the season.
Wondering which wall suits a commercial site? Send us the plan and the heights and we will respond with the options for a written quote, or start from our engineered retaining wall page.
Frequently asked questions
What are the best concrete blocks for retaining wall projects in Ontario?
Segmental concrete blocks made for retaining walls, with a lip or pin system and a tapered back, suit most low and medium walls. Standard hollow masonry blocks are not a substitute because they are not made to carry soil load or freeze and thaw. Above 1,000 mm next to public areas, the block system is chosen by the engineer who designs the wall.
Do wall blocks for retaining wall use need a building permit in Toronto?
Toronto requires a permit for a retaining wall more than one metre high that is on or next to public property, building entrances, or private property the public can reach. A wall on private property that the public cannot reach and that stays under one metre at every point does not need one. Zoning by-law rules apply either way.
When does a retaining wall need an engineer in Ontario?
When the wall is a designated structure under the Ontario Building Code: exposed height over 1,000 mm and next to public property, access to a building, or private property the public is admitted to. Part 4 of the Building Code then applies, and municipalities such as Barrie ask for design by a professional engineer licensed in Ontario.
Is a poured concrete wall stronger than a block wall?
Neither is stronger by default, because each is designed for its loads. A poured wall acts as one reinforced structure and suits tight sites, high loads and walls that carry a surcharge such as a driveway. A block wall works as stacked units, often tied back with geogrid, and suits longer runs where access for a form crew is limited.
Does a retaining wall need drainage behind it?
Yes. Water pressure behind a wall is a common cause of leaning and cracking. Every wall type needs a way for water to leave: free draining crushed stone, a drain outlet, and filter fabric to keep fine soil from clogging it.
Get a quote for your project
Tell us about the site, the scope, and your timeline. We review it and reply with the next step.