Built to spec
Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.
Harrowgate self-performs excavation, grading, liners, forebays, inlet and outlet works, erosion protection, and restoration for GTA and Ontario stormwater ponds. Harrowgate Group self-performs the work to your engineered drawings, load, and finish, and completes it on site across the GTA and Ontario.
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.
Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.
Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.
Heavy-duty steel and finishes chosen for the load, traffic, and environment on site.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Stormwater management pond construction creates an engineered end-of-pipe facility that controls runoff quality, erosion, and peak discharge through storage, settling, controlled release, and safe overflow. Harrowgate self-performs the GTA earthworks, structures, piping, grading, erosion protection, and restoration to the approved design and municipal acceptance criteria.
Self-performed on site to the engineered drawings, coordinated with concrete, servicing, and the surrounding work, then a clean, documented finish.
An engineered pond can settle suspended solids, detain frequent runoff for erosion control, reduce peak discharge for larger storms, and route flows above its normal operating range through a safe overflow. The approved drainage report defines each objective, storage volume, release rate, water level, and connection to the major and minor systems.
A forebay slows incoming water and captures coarse sediment before it reaches the main treatment cell. It localizes maintenance, protects the permanent pool, and can dissipate inlet energy. Harrowgate constructs the forebay berm, inlet apron, access route, and defined sediment-storage geometry so future cleanout can occur without rebuilding the pond.
Survey control is established outside the disturbed area, then used for subgrade contours, liner limits, pond bottom, shelves, berm crest, pipe inverts, outlet controls, and spillway. Harrowgate checks critical elevations before placing concrete or burying structures and provides an as-built survey that can be compared with the approved stage-storage design.
The geotechnical and hydraulic design determines liner need based on soil permeability, groundwater, permanent-pool requirements, nearby structures, and environmental setting. Liners can be compacted clay or synthetic systems. Harrowgate prepares the subgrade, protects penetrations, controls lift or seam quality, and prevents equipment damage during covering.
Where practical, clean drainage is diverted and sediment-laden runoff is treated through temporary controls before reaching permanent cells. Inlets are stabilized, exposed slopes are progressively seeded, and accumulated construction sediment is removed. Temporary measures remain until the upstream site is stable so permanent storage and outlet function are preserved.
Yes. We perform sediment removal, forebay reconstruction, outlet repairs, berm and liner work, spillway armouring, access improvements, and final grading and planting. The sequence includes temporary flow control and environmental limits so the live drainage system continues to operate while treatment volume and structure function are restored.
Typical records include as-built survey, compaction tests, liner quality results, concrete tests, pipe inspection, outlet dimensions, material tickets, planting records, and deficiency corrections. Harrowgate also documents final sediment removal and structure cleaning. The municipality or engineer may require additional commissioning and maintenance information before acceptance.
Commercial and heavy-civil construction, self-performed for developers, contractors, property managers, and municipalities.
Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB certified.
Licensed, Insured & WSIB Certified · Self-performed and documented on every job
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.
Harrowgate Group provides stormwater management ponds, delivered and installed with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.