Toronto Development Applications by Year and Ward, 2017 to 2025
Our analysis of City of Toronto data: 4,306 development applications filed from 2017 to 2025, the 1,962 still open, and which wards carry the most work.
Our analysis of City of Toronto data shows 4,306 development applications filed from 2017 to 2025, with 390 in 2025. Of the official plan, zoning and site plan applications on file, 1,962 are not marked closed, and Toronto Centre and Spadina-Fort York have the most.
By Harrowgate Group
Last updated: November 7, 2026
Development applications are the earliest public signal that a site will be demolished, excavated and rebuilt. For owners, developers and neighbours, they show what is coming and where. If you are planning work on or next to one of these sites, our excavation contractor team can review access, depth and sequence with you, and our bulk and foundation excavation page covers larger sites.
How many development applications does Toronto receive each year?
Between 357 and 843 a year over 2017 to 2025, with a peak in 2021 and 2022 and a lower level since. Here are the full counts by type, each application counted once.
| Year filed | Official plan or zoning (OZ) | Site plan (SA) | Subdivision (SB) | Part lot control (PL) | Condominium (CD) | All types |
|---|---|---|---|---|---|---|
| 2017 | 132 | 146 | 16 | 18 | 58 | 370 |
| 2018 | 118 | 194 | 7 | 11 | 61 | 391 |
| 2019 | 152 | 185 | 10 | 7 | 96 | 450 |
| 2020 | 164 | 193 | 17 | 10 | 67 | 451 |
| 2021 | 238 | 308 | 98 | 18 | 181 | 843 |
| 2022 | 244 | 361 | 12 | 8 | 66 | 691 |
| 2023 | 118 | 168 | 8 | 10 | 53 | 357 |
| 2024 | 166 | 115 | 9 | 8 | 65 | 363 |
| 2025 | 192 | 134 | 6 | 10 | 48 | 390 |
| Total | 1,524 | 1,804 | 183 | 100 | 695 | 4,306 |
The three years 2017 to 2019 had 1,211 applications. The three years 2023 to 2025 had 1,110, which is 8 per cent fewer. The 2021 peak is partly a one-off: it includes 98 subdivision applications, against a usual 6 to 17.
Is the pipeline of rezoning and site plan work shrinking?
Yes, compared with 2022. Official plan, zoning and site plan applications together reached 605 in 2022 and were 326 in 2025, a fall of 46 per cent. The 2025 count is higher than 2024 (281) and 2023 (286), so the low point looks to be behind us, though one year is not a trend.
Site plan filings fell furthest, from 361 in 2022 to 134 in 2025. Official plan and zoning filings held up better at 192 in 2025. Site plan applications usually come later in a project, once the zoning is settled, so a thin site plan year can follow a thin rezoning year. The data cannot confirm that link.
For contractors and owners, the practical reading is that fewer projects were filed in 2023 to 2025 than in 2021 and 2022. Whether that changes the amount of demolition, shoring and excavation work in the years that follow depends on which of those projects are approved and built, which this data does not show.
Which Toronto wards have the most open applications?
Toronto Centre, Spadina-Fort York and Willowdale. Counting official plan, zoning and site plan applications that the City has not marked as closed, these three wards hold 441 of the 1,976 ward-level entries.
| Ward | Open applications |
|---|---|
| 13 Toronto Centre | 152 |
| 10 Spadina-Fort York | 150 |
| 18 Willowdale | 139 |
| 12 Toronto-St. Paul's | 125 |
| 3 Etobicoke-Lakeshore | 122 |
| 8 Eglinton-Lawrence | 103 |
| 11 University-Rosedale | 97 |
| 15 Don Valley West | 95 |
| 20 Scarborough Southwest | 93 |
| 9 Davenport | 76 |
Open work is not limited to the downtown core. Etobicoke-Lakeshore, Scarborough Southwest and Willowdale all sit in the top nine. An application that crosses a ward line is counted in each ward it touches, which is why the ward total (1,976) is higher than the number of applications (1,962).
How many applications mention demolition or underground space?
Few mention demolition, and about one in six mentions underground space. Of the 3,328 official plan, zoning and site plan applications filed from 2017 to 2025, 190 (5.7 per cent) have the word demolition or demolish in their description, and 530 (15.9 per cent) mention underground, below grade or basement level space.
These are text matches on the description the City publishes, so they undercount: many applications describe the new building and say nothing about what is being removed. Still, the second figure matters for excavation. A basement level or underground parking garage means mass excavation, groundwater control and support of adjacent properties, and those drive the schedule of the whole job. Our site servicing contractor team and our concrete foundations crews work in the same sequence.
What does this mean for your project?
Treat a pending application next door as information about your own site. A few practical points:
- Check the City’s Application Information Centre. The City’s Application Information Centre lists active planning applications, and the entries show the proposal and the application type.
- Know the approval path. Ontario’s Planning Act sets out the framework for zoning, site plan control, plans of subdivision and part lot control that these application types follow.
- Plan for shared constraints. A neighbour’s excavation can affect shoring needs, vibration limits and access on your lot. Our post on shoring versus underpinning explains when each applies.
- Locate before you dig. Buried services do not follow lot lines. A GPR concrete scan checks slabs and structures before cutting or coring.
- Allow time. An approved application is not a building permit, and a building permit is not a start date.
Before you call us, have the address, what you plan to build or remove, the depth of any new basement or footings, and your target start date. We can then tell you what the site work needs. If a demolition comes first, see our post on Toronto demolition permits.
How we counted
We used the City of Toronto Open Data set Development Applications, downloaded on November 7, 2026 as a CSV of 26,713 rows.
- What counts: one application per application number. The file repeats an application on several rows (for example one per address), so 26,713 rows reduce to 8,639 applications, of which 4,306 were filed in 2017 to 2025.
- Year: the year of the submitted date. We kept only full calendar years, 2017 to 2025. Applications filed in 2026 are left out because the year is incomplete.
- Types: the file does not publish a list of its type codes, so we read them from the application descriptions. OZ descriptions refer to official plan and zoning amendments, SA to site plan approval, SB to draft plans of subdivision, PL to part lot control and CD mostly to draft plans of condominium. The catalogue says the data also includes Committee of Adjustment applications, which we could not separate from these codes.
- Open: any status other than “Closed”. This includes approved and appealed applications, so open does not mean undecided.
- Wards: the ward number and name on each row. Two open applications have no ward.
- Keywords: “demolition or demolish” and “underground, below grade or basement level” matched in the description text, among official plan, zoning and site plan applications.
- Checks: we computed every figure twice by two separate methods, and the results matched exactly.
- Limits: the data records applications, not buildings or units, and it does not say whether a project was approved, built or abandoned. Counts change daily as the City updates the file.
Contains information licensed under the Open Government Licence (Toronto).
Next step
If a Toronto site you own or manage is heading for excavation, start with our excavation contractor page and tell us what is planned.
Frequently asked questions
How many development applications does Toronto receive each year?
In our analysis of City of Toronto data, yearly filings ranged from 357 in 2023 to 843 in 2021 between 2017 and 2025. The most recent full year, 2025, had 390. The count includes official plan and zoning amendments, site plan, subdivision, part lot control and condominium applications.
Which Toronto wards have the most open planning applications?
Toronto Centre has the most open official plan, zoning and site plan applications in our analysis, with 152, followed by Spadina-Fort York with 150 and Willowdale with 139. Etobicoke-Lakeshore is fifth with 122. Counts change daily, so check the City's current data.
Does an approved development application mean construction starts soon?
No. An approval lets a project move to the next step, such as a building permit, but the data does not show when work begins. Financing, design changes and appeals all affect the start date, so ask the owner or the project team for a schedule.
Can a development application tell me where excavation is coming?
It can point to areas of activity, but not to jobs. About 16 per cent of the rezoning and site plan applications we counted mention underground parking or below grade space in their description, which usually means significant excavation if the project proceeds.
What should I do before excavating next to a site with a pending application?
Find out what the neighbouring project proposes, confirm utility locations, and agree on access, vibration limits and monitoring with an engineer before work starts. A project next door can change traffic, shoring needs and schedule on your own site.