Quote-Ready Now Engineer & City Coordinated Licensed & Insured

Free Tool

Gravel and granular base calculator

Enter the area and the finished depth of a Granular A or Granular B base to get cubic metres, tonnes, truck loads and the number of compaction lifts. The lift limit comes from the City of Toronto standard specification TS 501, and every source is listed below.

The 1,770 kg/m³ weight is the federal conversion for stone, not a test result for Granular A or B. The 18 tonne payload is an example. Enter your supplier's and hauler's figures.

We build granular bases and prepare subgrades across Ontario, including roadworks and pavement base and site grading. Related services: Granular base and subgrade prep, Roadworks and pavement base, Site grading and earthworks. Request a quote.

Results are for preliminary planning only. They are not a quote, a design or an engineering opinion. The engineer of record, the governing specification and the conditions on site decide what applies to your project.

Use this tool from any AI assistant

Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.

https://harrowgategroup.com/api/tools/gravel-and-granular-base-calculator?material=granular_a&units=m&length=20&width=6&depth=300&depth_unit=mm

All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.

Formulas used

Worked example

A 20 m by 6 m area with 300 mm of Granular A: 20 × 6 × 0.3 = 36 m³. At 1,770 kg/m³ that is 63.7 tonnes, which is 4 truck loads of 18 tonnes. 300 mm ÷ 150 mm gives 2 lifts of 150 mm.

Material and lift rules

ItemValueSource
Granular lift thickness, when not otherwise specifiedNot more than 150 mmToronto TS 501, clause 501.07.01
Granular A100% passing 26.5 mmTS 1010, Table 2
Granular B Type I100% passing 150 mmTS 1010, Table 2
Granular B Type II100% passing 106 mmTS 1010, Table 2
Stone, weight per volume1 m³ = 1.77 tonnesNatural Resources Canada conversion

Sources

Last checked 2026-11-09. Other municipalities and the Ministry of Transportation may set different lift thicknesses in their own specifications, and the specification for your project governs.

Placing the concrete or asphalt on top? Use our asphalt and concrete calculator.

Request a granular base or subgrade quote

A quantity is one input. A quote also reflects the subgrade, excavation, geotextile, compaction testing, access and the specification that applies. Send us the scope and we will arrange a site review.

We build granular bases and prepare subgrades across Ontario, including roadworks and pavement base and site grading. Related services: Granular base and subgrade prep, Roadworks and pavement base, Site grading and earthworks. Request a quote.

Cite this tool

Copy this HTML to link to the tool from your own page. All of our free planning tools are listed together.

FAQ

Granular base FAQ

How many tonnes of Granular A do I need?

Multiply the area by the finished depth to get cubic metres, then multiply by the weight per cubic metre. The calculator uses the federal conversion of 1.77 tonnes per cubic metre for stone as its starting point, and lets you enter your supplier's figure instead. Scale tickets from your supplier are the final word on weight.

What is the maximum lift thickness for granular base?

City of Toronto standard specification TS 501, which amends OPSS.MUNI 501, says in clause 501.07.01 that where the governing specifications do not say otherwise, the lift thickness for granular materials shall not exceed 150 mm. The calculator divides your depth into the fewest equal lifts of 150 mm or less. A project specification can set a different lift thickness, and that one governs.

What is the difference between Granular A and Granular B?

Both are defined in OPSS.MUNI 1010 as amended by Toronto TS 1010. Granular A is a dense graded aggregate for base courses, with 100 percent passing the 26.5 mm sieve. Granular B is a coarser, well-graded aggregate used as subbase and as granular backfill. Type I is 100 percent passing 150 mm and Type II is 100 percent passing 106 mm.

Why does the calculator not include 19 mm crusher run?

19 mm crusher run is a supplier product name, not a grade defined in OPSS.MUNI 1010 or in Toronto TS 1010. We did not find a published weight or lift rule for it, so the tool does not guess. If you buy it, enter the weight per cubic metre your supplier quotes.

How much extra should I order?

The tool leaves the allowance at zero because we did not find a published Ontario figure for compaction loss in granular base. Ask your supplier or the engineer for a figure and enter it in the allowance field.

Get a quote for your project

Tell us about the site, the scope, and your timeline.

Free, no-obligation quote & on-site assessment

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call 24/7 (416) 629-0721 Get a Quote