Quote-Ready Now Engineer & City Coordinated Licensed & Insured

Free Calculator

Asphalt and concrete calculator

Estimate the tonnes of hot mix asphalt for a paving area, or the cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every formula is shown below, and the density, waste and truck capacity are adjustable.

2,350 kg/m³ is about 146.7 lb/ft³, equal to 110 lb per square yard per inch.

Results are material estimates from the numbers you enter. They are not a quote and do not include base, forming, reinforcing or site conditions.

Use this tool from any AI assistant

Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.

https://harrowgategroup.com/api/tools/asphalt-concrete-calculator?mode=asphalt&units=ft&length=60&width=20&thickness=2&thickness_unit=in

All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.

Formulas used

Where the defaults come from

Before you dig

In Ontario, anyone who is going to dig must request locates first, and utility owners mark their buried lines at no charge. Requests go through the provincial locate authority, formerly Ontario One Call and now operating as Ontario Dig Authority (the older ontarioonecall.ca address forwards to it). Submit the request at least 5 business days before excavation, and request again if the work changes. Never assume the absence of marks means nothing is buried there.

Request a paving or concrete quote

A calculator gives a material quantity. A quote also reflects the subgrade, access, base preparation and drainage on your site. Send us the scope and we will arrange a site review and return a written price.

Cite this tool

Copy this HTML to link to the calculator from your own page.

FAQ

Asphalt and concrete FAQ

How is asphalt tonnage calculated?

Multiply the area by the compacted thickness to get the volume, then multiply the volume by the density of the compacted mix. At 2,350 kg per cubic metre, a 50 mm layer works out to about 0.118 tonnes per square metre. Published spread rates are usually quoted in pounds per square yard per inch of thickness, and the typical figure is 110 pounds per square yard per inch, which is the same density expressed another way.

Does every asphalt mix have the same density?

No. Mix type, aggregate, and the compaction achieved all change it. The Asphalt magazine article cited on this page notes that the Illinois Department of Transportation uses 112 pounds per square yard per inch and the Tennessee Department of Transportation primarily uses 106 for dense-graded mixes. That is why the density in the calculator is adjustable. Use the figure from your mix design or specification where you have one.

How much extra concrete should be ordered?

The National Ready Mixed Concrete Association advises ordering 4% to 10% more than the quantity calculated from the plan dimensions, to account for uneven subgrade, spillage, and over-excavation. The waste field in the calculator defaults to 7%, inside that range.

How much concrete does a ready-mix truck carry?

The National Ready Mixed Concrete Association states that the capacity of truck mixers varies between 8 and 12 cubic yards (5 to 9 cubic metres). The calculator defaults to 8 cubic metres per load and lets you change it to match the producer you are ordering from.

Is a calculator result the same as a quote?

No. The result is a material quantity based on the numbers you enter. A quote also depends on subgrade condition, access, base preparation, drainage, and the specification that applies, which is why a site review comes first.

Do I need to request locates before excavating in Ontario?

Yes. Under the Ontario Underground Infrastructure Notification System Act, 2012, anyone digging in Ontario must contact the locate authority first. That organization was formerly called Ontario One Call and now operates as Ontario Dig Authority. Its site advises submitting a locate request at least 5 business days before you dig, and utility owners mark their lines at no charge.

Get a quote for your project

Tell us about the site, the scope, and your timeline.

Free, no-obligation quote & on-site assessment

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call 24/7 (416) 629-0721 Get a Quote