Free Tool
Curb and sidewalk concrete calculator
Enter a run length and a cross-section to get the cubic metres of concrete for a sidewalk, a curb, or a curb and gutter. It adds a waste allowance, counts ready-mix truck loads and flags a sidewalk narrower than the Ontario accessible path width.
Results are for preliminary planning only. They are not a quote, a design or an engineering opinion. The engineer of record, the governing specification and the conditions on site decide what applies to your project.
Use this tool from any AI assistant
Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.
All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.
Formulas used
- Sidewalk volume (m³): length × width × thickness, in metres.
- Curb section area (m²): curb height × average curb width + gutter width × gutter thickness, in metres. Volume = section area × run length.
- Order quantity: volume × (1 + waste % ÷ 100). Cubic yards = cubic metres × 1.30795.
- Truck loads: order quantity ÷ truck capacity, rounded up to whole loads.
- Metres of curb per cubic metre: 1 ÷ section area.
Where the defaults come from
- Sidewalk width check. Section 80.23 of the Integrated Accessibility Standards Regulation, Ontario Regulation 191/11: a minimum clear width of 1,500 mm for new or redeveloped exterior paths of travel that are outdoor sidewalks or walkways, 1,200 mm as a turning space where the path meets a curb ramp. Section 80.21 and 80.22 set which paths and organizations the requirement covers. The 1.5 m default width and 125 mm default thickness are adjustable planning values, not requirements.
- Concrete waste and truck size. The NRMCA guide Concrete in Practice 31: Ordering Ready Mixed Concrete advises ordering 4% to 10% more than the plan quantity and states that truck mixers carry 8 to 12 cubic yards (5 to 9 cubic metres). The 7% waste and 8 m³ load defaults are adjustable assumptions inside those ranges.
For a total with asphalt, base or other concrete shapes, use our asphalt and concrete calculator.
Request a curb or sidewalk quote
A volume is one input. A quote also reflects the base, forming, reinforcing, joints, drainage tie-ins and the municipal standard drawing that applies. Send us the scope and we will arrange a site review.
Cite this tool
Copy this HTML to link to the tool from your own page. All of our free planning tools are listed together.
Curb and sidewalk concrete FAQ
How do I find the concrete volume for a run of curb?
Take the cross-section area of the curb, and of the gutter pan if there is one, and multiply it by the length of the run. A curb 150 millimetres wide and 300 millimetres high has a section of 0.045 square metres, so 100 metres of it is 4.5 cubic metres before waste. The calculator does the same sum from the section dimensions you enter.
What is the minimum width of a new public sidewalk in Ontario?
Section 80.23 of the Integrated Accessibility Standards Regulation (Ontario Regulation 191/11) sets a minimum clear width of 1,500 millimetres for new or redeveloped exterior paths of travel that are outdoor sidewalks or walkways, reduced to 1,200 millimetres to serve as a turning space where the path connects with a curb ramp. The requirement applies to obligated organizations other than small organizations, so check whether it applies to your project.
What slopes does the regulation allow on an accessible sidewalk?
Section 80.23 limits the cross slope of an exterior path of travel to 1 in 20 on asphalt, concrete or other hard surfaces. The running slope is limited to 1 in 20, although a sidewalk may be steeper than that where it cannot be steeper than the adjacent roadway.
How much extra concrete should be ordered?
The National Ready Mixed Concrete Association advises ordering 4 to 10 percent more than the quantity calculated from plan dimensions to allow for uneven subgrade, spillage and over-excavation. The waste field defaults to 7 percent, inside that range, and can be changed.
Does the calculator account for the base under the concrete?
No. It reports concrete only. The granular base, formwork, reinforcing, joints and finishing are separate quantities set by the specification and the drawings.