Quote-Ready Now Engineer & City Coordinated Licensed & Insured

Free Tool

Trench shoring requirement checker

Enter the depth, width and soil type of an excavation to see whether Ontario Regulation 213/91 requires a support system, which kinds are permitted, and which other excavation rules apply. Every result cites the section it comes from.

If more than one type is present, choose the highest number (section 227(3)).

Results are for preliminary planning only. They are not a quote, a design or an engineering opinion. The engineer of record, the governing specification and the conditions on site decide what applies to your project.

Use this tool from any AI assistant

Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.

https://harrowgategroup.com/api/tools/trench-shoring-checker?units=m&depth=2.5&width=1&soil=2&enter=yes&wall=vertical

All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.

Rules this checker applies

Source

All values come from Ontario Regulation 213/91, Construction Projects on e-Laws (Part III, Excavations, sections 222 to 242, and sections 6 and 7), read on 8 November 2026. Regulations are amended from time to time, so confirm against the current consolidation before relying on a result.

Before you dig

Section 228 requires gas, electrical and other services in and near the area to be located and marked before an excavation begins. In Ontario, locate requests go through Ontario Dig Authority, formerly Ontario One Call. Its site advises submitting a request at least 5 business days before you dig and requesting again if the project changes.

Request an excavation and shoring quote

This checker reads the published rules. A quote also reflects soil conditions, groundwater, adjacent structures, utilities and access, which is why a site review comes first. Send us the scope and we will arrange one.

Cite this tool

Copy this HTML to link to the tool from your own page. All of our free planning tools are listed together.

FAQ

Trench shoring FAQ

At what depth does an Ontario excavation need a support system?

Section 234 of Ontario Regulation 213/91 (Construction Projects) requires the walls of an excavation to be supported, and then lists the exceptions. The first exception is an excavation less than 1.2 metres deep. Others cover an excavation no worker is required to enter, one cut in sound and stable rock, and one whose walls are sloped back at the gradients the regulation sets out for each soil type.

How are the four soil types decided?

Section 226 describes Type 1, 2, 3 and 4 soil, and section 227 says the type is decided by visual and physical examination of the walls of the excavation and of the ground out to a distance equal to the excavation depth. Where more than one type is present, the highest number governs.

When is an engineered support system mandatory?

Section 235(2) states that where the excavation is a trench and the depth exceeds six metres or the width exceeds 3.6 metres, the support system must be an engineered support system designed for the specific location and project. Section 222 defines a trench as an excavation whose depth exceeds its width.

Can a trench box be used in any soil?

Not in Type 4 soil. Section 237(1) says no prefabricated or hydraulic support system shall be used in Type 4 soil, subject to the narrow pipe-break repair exception in section 237(2). Under section 236 every prefabricated, hydraulic or engineered system must be designed by an engineer and used in accordance with its drawings.

Does this tool replace a competent person or an engineer?

No. It reads the published rules against the numbers you enter. Soil classification, hydrostatic pressure, adjacent structures, surcharge and the actual support design are decisions for the engineer of record and the competent person on site, and the regulation itself should be read in full.

Get a quote for your project

Tell us about the site, the scope, and your timeline.

Free, no-obligation quote & on-site assessment

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call 24/7 (416) 629-0721 Get a Quote