Enter the depth, width and soil type of an excavation to see whether Ontario Regulation 213/91 requires a support system, which kinds are permitted, and which other excavation rules apply. Every result cites the section it comes from.
Results are for preliminary planning only. They are not a quote, a design or an engineering opinion. The engineer of record, the governing specification and the conditions on site decide what applies to your project.
Use this tool from any AI assistant
Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.
All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.
Rules this checker applies
- Section 222. A trench is an excavation whose depth exceeds its width.
- Sections 226 and 227. Soil is classified Type 1 to 4 by visual and physical examination, and the highest-numbered type present governs.
- Section 234(1) and (2). Walls must be supported unless the excavation is under 1.2 m deep, no worker is required to enter it, it is not a trench and no worker must be closer to a wall than the wall height, it is cut in sound and stable rock, it is sloped as listed for the soil type, or (not a trench, not Type 4) an engineer has given a written opinion under clause (h). Sloping exceptions: Type 1 or 2 sloped to 1.2 m or less from the bottom at a minimum gradient of one vertical to one horizontal; Type 3 sloped from the bottom at 1 vertical to 1 horizontal; Type 4 sloped from the bottom at 1 vertical to 3 horizontal.
- Section 235. A support system is timbering and shoring to the Table in section 238 (no hydrostatic pressure, within the table limits), a prefabricated system, a hydraulic system, or an engineered system. For a trench deeper than 6 m or wider than 3.6 m it must be an engineered system designed for the location and project.
- Sections 236 and 237. Prefabricated, hydraulic and engineered systems are designed by an engineer and used to their drawings. Prefabricated and hydraulic systems are not used in Type 4 soil, apart from the pipe-break repair exception in section 237(2).
- Section 238 Table. Timber shoring is tabulated for depths to 3.0 m (soil types 1 to 4), over 3.0 m to 4.5 m (types 1 to 3) or to 4.0 m (type 4), and over 4.5 m to 6.0 m (types 1 to 3). There is no timber row for Type 4 soil deeper than 4.0 m.
- Sections 225, 228, 229, 230, 231, 233, 240 and 241. Another worker above ground near a trench; services located and marked first; engineer-specified precautions for adjacent structures; excavation kept reasonably free of water; 450 mm clear work space to formwork or masonry; a 1 m clear level strip at the top edge; a 1.1 m barrier on unsloped walls where a person could fall into an excavation deeper than 2.4 m; a ladder inside the protected area; support extending at least 0.3 m above the top of the excavation.
- Sections 6 and 7. Notice to the Ministry before work begins on a trench more than 1.2 m deep into which a worker may enter, where a notice of project is not otherwise required, and a notice of project where a part of the work must be designed by an engineer.
Source
All values come from Ontario Regulation 213/91, Construction Projects on e-Laws (Part III, Excavations, sections 222 to 242, and sections 6 and 7), read on 8 November 2026. Regulations are amended from time to time, so confirm against the current consolidation before relying on a result.
Before you dig
Section 228 requires gas, electrical and other services in and near the area to be located and marked before an excavation begins. In Ontario, locate requests go through Ontario Dig Authority, formerly Ontario One Call. Its site advises submitting a request at least 5 business days before you dig and requesting again if the project changes.
Request an excavation and shoring quote
This checker reads the published rules. A quote also reflects soil conditions, groundwater, adjacent structures, utilities and access, which is why a site review comes first. Send us the scope and we will arrange one.
Cite this tool
Copy this HTML to link to the tool from your own page. All of our free planning tools are listed together.
Trench shoring FAQ
At what depth does an Ontario excavation need a support system?
Section 234 of Ontario Regulation 213/91 (Construction Projects) requires the walls of an excavation to be supported, and then lists the exceptions. The first exception is an excavation less than 1.2 metres deep. Others cover an excavation no worker is required to enter, one cut in sound and stable rock, and one whose walls are sloped back at the gradients the regulation sets out for each soil type.
How are the four soil types decided?
Section 226 describes Type 1, 2, 3 and 4 soil, and section 227 says the type is decided by visual and physical examination of the walls of the excavation and of the ground out to a distance equal to the excavation depth. Where more than one type is present, the highest number governs.
When is an engineered support system mandatory?
Section 235(2) states that where the excavation is a trench and the depth exceeds six metres or the width exceeds 3.6 metres, the support system must be an engineered support system designed for the specific location and project. Section 222 defines a trench as an excavation whose depth exceeds its width.
Can a trench box be used in any soil?
Not in Type 4 soil. Section 237(1) says no prefabricated or hydraulic support system shall be used in Type 4 soil, subject to the narrow pipe-break repair exception in section 237(2). Under section 236 every prefabricated, hydraulic or engineered system must be designed by an engineer and used in accordance with its drawings.
Does this tool replace a competent person or an engineer?