Hydro excavation or mechanical digging near buried electrical lines

Enter where you are in the locate process and how close the dig will come to a located underground electrical distribution line. The checker applies the Electrical Safety Authority excavation guideline and tells you which methods it allows at this stage.

Results are for preliminary planning only. They are not a quote, a design or an engineering opinion. The engineer of record, the governing specification and the conditions on site decide what applies to your project.

Use this tool from any AI assistant

Paste this link into ChatGPT, Claude, Gemini, Copilot, Perplexity or any AI assistant and ask it to read the result. The answer carries its source and a link back to this page.

https://harrowgategroup.com/api/tools/hydro-excavation-vs-mechanical-checker?locate=current&area=inside&orientation=parallel&test_holes=yes&clearance=0.5&units=m&method=mech

All tools and their parameters are listed at /api/tools/. AI apps that support MCP can connect to https://harrowgategroup.com/mcp.

Rules this checker applies

Source

The rules come from the Electrical Safety Authority, Guideline for Excavating in the Proximity of Underground Distribution Lines, Version 3.1, issued 15 February 2022 under Ontario Regulation 22/04, Electrical Distribution Safety, read on 8 November 2026. The guideline says it contains guidelines only and may be revised, so confirm the current version and the instructions on your own locate form. The general duty to have services located and marked first is in section 228 of Ontario Regulation 213/91.

Before you dig

Locates are requested through Ontario Dig Authority, formerly Ontario One Call. Its site advises submitting a request at least 5 business days before you dig, states that locates are required for any project that breaks ground regardless of size or depth, and says a new locate is required if the project changes. It also notes that it relays your request and does not mark the lines itself.

Request hydro excavation or utility exposure

This checker applies a published guideline to the answers you give. Real sites also involve other utilities, abandoned lines and unmarked services. Send us the scope and we will plan the exposure work and arrange a site review.

Cite this tool

Copy this HTML to link to the tool from your own page. All of our free planning tools are listed together.

FAQ

Digging near buried lines FAQ

When must I use hydro excavation or hand digging instead of a machine?

Under the Electrical Safety Authority guideline for excavating near underground distribution lines (Version 3.1), where the proposed excavation runs parallel to and within the located area of a distribution line, the excavator exposes the line first by hand digging or vacuum excavation (section 6.1). After test holes have located the line, mechanical excavation is allowed, but not closer than 0.3 metres in any direction. Within 0.3 metres the work is done by hand digging or vacuum excavation (section 7.1).

What counts as vacuum excavation and as hand digging?

The guideline defines vacuum excavation, also called hydrovac, as the use of pressurized water or compressed air to loosen soil and a vacuum system to remove it. Hand digging means excavating with a shovel with a wooden or insulated handle, and does not include picks, bars, stakes or other earth-piercing devices. Hand-held augers, picks, bars and stakes are classed as mechanical excavation.

Do I still need a locate if I am only hand digging?

Yes. The guideline notes that a locate is required for hand digging and for mechanical excavation. In Ontario the locate is requested through Ontario Dig Authority, formerly Ontario One Call, at least 5 business days before you dig according to its website.

What if I find a line that was not marked?

Section 9.1 of the guideline says that where a line is found that the distributor did not identify, but within the area covered by the locate, the excavator must never assume it is abandoned. Contact the distributor immediately to find out whether it is abandoned or live.

Does this cover gas, water and telecom lines?

No. This checker applies only the electrical distribution guideline. Other utility owners publish their own requirements, so follow the instructions on their locate responses. The general duty in section 228 of Ontario Regulation 213/91 to have services located and marked before an excavation begins applies to all of them.

Get a quote for your project

Tell us about the site, the scope, and your timeline.

Free, no-obligation quote & on-site assessment

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Brookfield Properties logo Brookfield Properties
Scotiabank logo Scotiabank
KPMG logo KPMG
Deloitte logo Deloitte
Wells Fargo logo Wells Fargo
Bell logo Bell
Call 24/7 (416) 629-0721 Get a Quote