Trench Shoring Requirement Checker Inputs: units: m; depth: 2.5; width: 1; soil: 2; enter: yes; wall: vertical; hydrostatic: no; adjacent: no; engineer_opinion: no Result: A support system is required under section 234(1). - Depth and width: 2.50 m (8.2 ft) by 1.00 m - Classified as: Trench (depth exceeds width) - Soil type: Type 2 Depth is 1.2 m or more, a worker will enter, the excavation is a trench (depth exceeds width), and none of the section 234(2) exceptions was selected. Permitted support options: - Timbering and shoring to the section 238 Table (section 235(1)(a)). Sheathing 50 mm × 200 mm at 1.2 m o/c; struts 150 × 150 mm (for an excavation width at the strut of up to 1.8 m); vertical spacing 1.2 m*; horizontal spacing 2.4 m*; wales 200 × 200 mm. Struts are Number 1 structural grade spruce, wedged and cleated (section 238(3) to (5)). * For excavations to 3 m deep in soil types 1 and 2, wales can be omitted if struts are used at 1.2 m horizontal spacings. - Prefabricated support system, such as a trench box (section 235(1)(b)). Designed by an engineer (section 236(1)) and installed and used to its drawings, with the space between box and wall kept to the minimum needed for forward progression (section 237(1)(b)). - Hydraulic support system (section 235(1)(c)). Designed by an engineer, and its walls must touch the walls of the excavation (section 237(1)(c)). - Engineered support system (section 235(1)(d)). Designed for the specific project and location, and checked by the engineer against the actual soil conditions (section 236(6)). Other rules that apply: - The support system is installed progressively in Type 1, 2 or 3 soil and in advance in Type 4 soil where practicable, gives continuous support, and is removed only immediately before backfilling under a competent person (section 239). A ladder goes inside the protected area (section 240). The system extends at least 0.3 m above the top of the excavation (section 241(1)). - Depth exceeds 2.4 m: where a person could fall in, a barrier at least 1.1 m high is required at the top of every unsloped wall (section 233(4)). - Another worker must be working above ground in close proximity to the trench or its means of access (section 225). - A trench more than 1.2 m deep that a worker may enter needs notice to the nearest Ministry office before work begins, where a notice of project is not already required (section 7). - Keep a level strip at least 1 m wide at the top edge clear of equipment, spoil and materials (section 233(1)). Keep the excavation reasonably free of water (section 230), keep a clear work space of at least 450 mm to any formwork or masonry (section 231), and have all services located and marked first (section 228). Limits: Preliminary planning only. Regulations are amended from time to time; confirm against the current consolidation. The engineer of record and the competent person on site govern. Source: Ontario Regulation 213/91, Construction Projects, Part III Excavations, sections 222 to 242, and sections 6 and 7 (e-Laws, ontario.ca/laws/regulation/910213), read 8 November 2026. Tool: https://harrowgategroup.com/trench-shoring-checker/ Free quote: https://harrowgategroup.com/trench-shoring-checker/#audience-quote