Excavation and Spoil Volume Calculator Inputs: units: m; length: 30; width: 1.2; depth: 2.5; slope: 0; sides: long; material: earth; truck: 10 Result: - Opening at the top: 30.00 m by 1.20 m - Bank volume (in the ground): 90.00 m³ (117.72 yd³) - Loose volume at 25.0% swell: 112.50 m³ (147.14 yd³) - Truck loads: 12 (11.25 exact at 10.0 m³ per load) Limits: Preliminary planning only. Swell factors are planning values; use your geotechnical figure where you have one. The engineer of record and conditions on site govern. Source: Swell ranges from the Engineering ToolBox soil and rock bulking factor table; minimum wall gradients from Ontario Regulation 213/91, section 234(2)(e), (f) and (g). Tool: https://harrowgategroup.com/excavation-spoil-volume-calculator/ Free quote: https://harrowgategroup.com/excavation-spoil-volume-calculator/#audience-quote